Infrastructure

I
Area of land allotted (inacres)
 
Whether land transferred in the Name of Samiti
 
Vidyalaya shifted to permanent building on
30 acres
 
 
Yes
 
 
1990
II
Status of Boundary Wall
 
  1. Brick Wall
  2. Barbed wire fencing
Completed
 
 
(a) Brick Wall
 
III
Permanent buildings constructed
CBRI pattern
IV
School building
Complete
V
Dormitories
Boys 02 Nos
with warden Residence 02 Nos
 
 
Girls …………………..Nos
 with warden Residence …………….Nos
VI
Kitchen /dining Hall
 
No.of shifts required for all students to take food
Complete
 
 
 
VII
Principal Residence
01 No.
.
VIII
Staff Quarters
TypeIII=12 Nos.
TypeII= 12 Nos
TypeI=12 Nos
SP Sheds converted into Staff Qrs:………Nos
IX
M.P.Hall
Available
X
Workshop
Available
XI
Type of O.H.Tank
It’s capacity
 
Present Status
 
 
Shaft type/Column based
 1 LAKH litres
 
Working satisfactory
 
XII
U.G. tank
 
It’s capacity
 
Present status
 
 
 One lakh litres
 
Working satisfactory
XIII
D.G.Set
Available
………………make
10 KV
 
Year of procurement
XIV
Sewage pump
 nil
XV
Water pump
10 H.P, 7.5 H.P, 1.5 H.P
XVI
Electrification
 
Electronic Connection
 
Substation building
 
Street lighting
 
No.of hrs.during day when power supply is available on an average
 
 
Rural
 
Complete
 
 45 Nos.of poles
 
24hrs.
XVII
Play fields
 
400 meter track
40 x 30 meter basket ball court
40 x 30 meter volley ball court
 
 
 
Available
02 Nos. Available
 
02 Nos. Available
 
XVIII
Water supply
Tube well
Hand Pump
Connection from PHED
 
Potable 01 Nos. working
 
 
XIX
Rajiv Gandhi Smriti Van
Available
XX
Fire fighting arrangement
Working
XXI
Last date of cleaning of
(a)    Septic tank
(b)   Water tanks
Oct. 2011
XXII
Whether area around transformer is fenced
Yes
XXIII
Whether opens wells, if any ,are covered from top
Yes
XXIV
Works taken up under M&R fund during current year and last year:-
4.30 lakhs
Year
Name of work
(M&R)
Expenditure
Cumulative expenditure during the year
2011-12
White wash
4.30
4.30